Skip to content Skip to main navigation Skip to footer

Manufactured Home Placement Permit

General services and inquiries are available by email and phone from 8:30 AM to 4:30 PM.  In-person services are available by appointment from 9:00 AM to 1:00 PM.  Please call 541-766-6819 or email to permitcheck@bentoncountyor.gov  to schedule appointments or ask questions in advance.

To place a new manufactured home on a vacant parcel you will need to obtain zoning approval. For more details email permitcheck@bentoncountyor.gov call 541-766-6819 and ask to speak to a planner in our Planning Division.

Placing a new manufactured home on a vacant parcel

To place a new manufactured home on a vacant parcel, you will need to obtain zoning approval. For more details email permitcheck@bentoncountyor.gov call 541-766-6819 and ask to speak to a planner in our Planning Division.

Replacing a manufactured home in a resource zone

To replace a manufactured home in a resource zone (farm or forest zone), you will need to obtain zoning approval. For more details email permitcheck@bentoncountyor.gov or call 541-766-6819 and ask to speak to a planner in our Planning Division.

Access and Water Supply Worksheet

Any new or replacement of a manufactured home must ensure that the access and water availability on site is adequate for fire rescue.

View Access and Water Supply Worksheet (PDF)

Onsite Septic Permit Application

New Manufactured Home

A previously approved Onsite Septic Site Feasibility Permit is required, along with a new application for an onsite septic installation.

For more details email permitcheck@bentoncountyor.gov

Replacement Manufactured Home

If proposing to connect to an existing onsite septic system, you will need to submit an application for an onsite authorization.

For more details email permitcheck@bentoncountyor.gov

Address Request or Confirmation Form

New Manufactured Home

An address request form is required and the address will be released at the time of permit issuance. If the property does not have an address, the property will be referenced by the Map and Taxlot on all forms.

Replacement Manufactured Home

An address confirmation form is required to confirm that the existing address is still accurate.

View Address Confirmation or Address Request Form (PDF)

Additional Permit Processes and Requirements for Manufactured Homes

Once a site plan is stamped “received” by the Planning Division please call 541-766-6819 to schedule an appointment with a Building Permit Technician for application submittal. At the time of submittal please provide the following documents:

Manufactured home placement in a park

Manufactured Homes and the Floodplain

If your proposed structure or demolition is within the floodplain you will also need to submit a floodplain development application.

View Floodplain Development Application (PDF)

Back to top